The SHADOW Product
Pictured is the SHADOW (patent pendng) with a Capacitance Probe as a water level indicator.
The SHADOW is designed to operate using the 4-20 ma
signal from a Capacitance Probe that is installed in the the standard
McDonnell & Miller 157 or 193 water column housing with a McDonnell &
Miller E- Head. Click here to take a look at a typical installation for this SHADOW
product.
What You Need to Know Before Ordering
- SHADOW comes in one standard model, with an optional High Temperature Mounting Bracket.
- Do you need a High Temperature Mounting Bracket?
- This bracket provides more separation between the electronic components and the ball valve, and is recommended if you are not able to provide adequate ventilation to the upper unit. This may be the case if the unit is installed in a confined area or if you are only able to mount the unit vertically mounting the unit at an angle normally provides sufficient ventilation.
- The SHADOW works with McDonnell & Miller Low Water Cut-Offs.
- What kind of a McDonnell & Miller Low Water Cut Off do you have?
- Series 157
- You will need
- SHADOW (High temperature mounting base is optional)
- McDonnell & Miller 150E Head
- Estimated Labor time for first installation = 8 Hours
- SHADOW Installation Instruction Manual #157
- You will need
- Series 193
- You will need
- SHADOW (High temperature mounting base is optional)
- Warrick Controls, Inc. Solid State Open Circuit Board Series 26DOF
- Warrick Controls, Inc. Electrode Fitting Series 3E1B
- Estimated Labor time for first installation = 10 Hours
- SHADOW Installation Instruction Manual #193
- You will need
- Series 194
- You will need
- SHADOW (High temperature mounting base is optional)
- Warrick Controls, Inc. Solid State Open Circuit Board Series 26DOF
- Warrick Controls, Inc. Electrode Fitting Series 3E1B
- Estimated Labor time for first installation = 10 Hours
- SHADOW Installation Instruction Manual #194
- Series 157